docs(07): create phase plan — 5 plans, verification passed

5 waves: system_settings DB + HKDF encryption (01), ProviderConfig +
GenericOpenAIProvider + singleton client fix (02), Anthropic output_config +
classifier wiring (03), Celery retry 30/90/270s + re-queue endpoint (04),
admin AI panel + DocumentCard badge + human checkpoint (05).

All 18 decisions D-01..D-18 covered. Plan checker passed after 1 revision
round (4 blockers fixed: D-02/D-14 coverage, D-11 Vitest tests, Plan 05
files_modified).

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
curo1305
2026-06-03 18:25:00 +02:00
co-authored by Claude Sonnet 4.6
parent 6c8e0d8bde
commit 3df62506c9
11 changed files with 2328 additions and 26 deletions
+20 -18
View File
@@ -1,24 +1,24 @@
---
gsd_state_version: 1.0
milestone: v1.0
milestone_name: "Performance & Production Hardening"
current_phase: "06"
status: planned
last_updated: "2026-06-02T00:00:00.000Z"
milestone_name: "audit gaps: SHARE-02/STORE-06/ADMIN-06"
current_phase: 7
status: executing
last_updated: "2026-06-03T16:24:52.248Z"
progress:
total_phases: 1
completed_phases: 0
total_plans: 6
completed_plans: 0
percent: 0
total_phases: 9
completed_phases: 7
total_plans: 55
completed_plans: 44
percent: 78
---
# Project State
**Project:** DocuVault
**Status:** Executing Phase 06.2
**Current Phase:** 06.2
**Last Updated:** 2026-05-28
**Status:** Phase 7 Planned — Ready to Execute
**Current Phase:** 7
**Last Updated:** 2026-06-03
## Phase Status
@@ -32,14 +32,15 @@ progress:
| 6 | Performance & Production Hardening | Not started |
| 6.1 | Close v1.0 audit gaps: SHARE-02/STORE-06/ADMIN-06 | ✓ Complete (2/2 plans) |
| 6.2 | Close v1 sharing + cloud-delete + CSV export gaps | ✓ Complete (5/5 plans, UAT passed, security gate passed) |
| 7 | Redo and Optimize LLM Integration | Planned (5/5 plans, verification passed) |
## Current Position
Phase: 06.2 (close-v1-sharing-cloud-delete-csv-export-gaps) — EXECUTING
Plan: 1 of 5
**Phase:** 05-cloud-storage-backends — Complete (12/12 plans, all UAT gaps resolved)
**Plan:** 05-12 — complete
**Progress:** [██████████] 100%
Phase: 7 (redo-and-optimize-llm-integration) — PLANNED
Plan: 0 of 5
**Phase:** 07-redo-and-optimize-llm-integration — Ready to execute (5 plans, verification passed 2026-06-03)
**Plan:** 07-01 — next
**Progress:** [__________] 0%
## Performance Metrics
@@ -201,6 +202,7 @@ _Updated at each phase transition._
| Last session | 2026-05-30 — Plan 05-12 executed: OAuth 400 preflight (unconfigured creds), 502 cloud fallback, celery-worker volume mount, upload hint in CloudStorageView; 293 passed / 24 xfailed / 1 pre-existing failure |
| Last session | 2026-05-30 — Phase 6.1 executed: 7 share tests + 4 audit tests promoted from xfail stubs; second_auth_user fixture added; 309 passed / 0 failed |
| Last session | 2026-05-31 — Phase 6.2 planned: 4 plans (3 waves); SHARE-03/SHARE-05 (Plan 02), cloud-delete (Plan 03), ADMIN-06 audit enrichment + CSV + daily exports (Plan 04); verification passed (0 blockers, 2 cosmetic warnings fixed) |
| Next action | Milestone v1.0 complete — run /gsd:complete-milestone or start Phase 6 (Performance & Production Hardening) |
| Last session | 2026-06-03 — Phase 7 planned: 5 plans (5 waves); system_settings DB + HKDF (Plan 01), ProviderConfig + GenericOpenAIProvider + singleton fix (Plan 02), Anthropic output_config + classifier wiring (Plan 03), Celery retry harness + re-queue endpoint (Plan 04), admin AI panel + DocumentCard badge (Plan 05); verification passed (4 blockers fixed in revision round, 0 remaining) |
| Next action | Execute Phase 7 — run /gsd:execute-phase 7 |
| Pending decisions | None |
| Resume file | None |