docs(phase-6.2): record planning complete — 4 plans verified, state updated

- ROADMAP.md: progress table → Planned; wave annotations already added by planner
- STATE.md: phase 6.2 row → Planned (4 plans, 3 waves); session note added
- 06.2-03-PLAN.md: remove incorrect SHARE-03/SHARE-05 from requirements field
- 06.2-RESEARCH.md: mark Open Questions section as RESOLVED
- 06.2-UI-SPEC.md: add to version control (was untracked)

Verification: 0 blockers, 2 cosmetic warnings fixed.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
curo1305
2026-05-31 11:41:32 +02:00
parent 4adc77d8cc
commit 708fd7fad0
5 changed files with 326 additions and 8 deletions
+3 -2
View File
@@ -31,7 +31,7 @@ progress:
| 5 | Cloud Storage Backends | ✓ Complete (12/12 plans, UAT 5/6 passed, 3 gaps closed by 05-12) |
| 6 | Performance & Production Hardening | Not started |
| 6.1 | Close v1.0 audit gaps: SHARE-02/STORE-06/ADMIN-06 | ✓ Complete (2/2 plans) |
| 6.2 | Close v1 sharing + cloud-delete + CSV export gaps | Not started |
| 6.2 | Close v1 sharing + cloud-delete + CSV export gaps | Planned (4 plans, 3 waves) |
## Current Position
@@ -197,6 +197,7 @@ _Updated at each phase transition._
| Last session | 2026-05-30 — Phase 5 UAT: 5/6 tests passed; 3 gaps diagnosed (OneDrive unconfigured 500, cloud doc stream opaque 500, DropZone disappeared); gap-closure plan 05-12 created (3 tasks, wave 1) |
| Last session | 2026-05-30 — Plan 05-12 executed: OAuth 400 preflight (unconfigured creds), 502 cloud fallback, celery-worker volume mount, upload hint in CloudStorageView; 293 passed / 24 xfailed / 1 pre-existing failure |
| Last session | 2026-05-30 — Phase 6.1 executed: 7 share tests + 4 audit tests promoted from xfail stubs; second_auth_user fixture added; 309 passed / 0 failed |
| Next action | Run /gsd:verify-work 6.1 to confirm Phase 6.1 complete |
| Last session | 2026-05-31 — Phase 6.2 planned: 4 plans (3 waves); SHARE-03/SHARE-05 (Plan 02), cloud-delete (Plan 03), ADMIN-06 audit enrichment + CSV + daily exports (Plan 04); verification passed (0 blockers, 2 cosmetic warnings fixed) |
| Next action | Run /gsd:execute-phase 6.2 |
| Pending decisions | None |
| Resume file | None |