Files
kite/.planning/milestones/v0.2-phases/10-ux-interaction/10-05-SUMMARY.md
T
curo1305andClaude Sonnet 4.6 123ae5b29b chore: archive v0.2 phase directories to milestones/v0.2-phases/
Moves phases 08–11 execution artifacts from .planning/phases/ to
.planning/milestones/v0.2-phases/ to keep .planning/phases/ clean
for the next milestone.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-17 14:34:52 +02:00

3.9 KiB

phase, plan, subsystem, tags, dependency_graph, tech_stack, key_files, decisions, metrics
phase plan subsystem tags dependency_graph tech_stack key_files decisions metrics
10-ux-interaction 05 frontend-tests
wave-0
test-stubs
nyquist
ux
vitest
requires provides affects
wave-0-stubs-ux-02-03-04-05-06-07-08-09-11-13-14
plans/10-06
plans/10-07
plans/10-08
plans/10-09
added patterns
vitest-it-todo-stub-pattern
nyquist-red-before-green
created modified
frontend/src/components/storage/__tests__/StorageBrowser.skeleton.test.js
frontend/src/components/layout/__tests__/AppSidebar.empty.test.js
frontend/src/views/admin/__tests__/AdminAuditView.skeleton.test.js
frontend/src/views/admin/__tests__/AdminUsersView.skeleton.test.js
frontend/src/components/ui/__tests__/dropdown.test.js
frontend/src/__tests__/keyboard.test.js
frontend/src/components/layout/__tests__/OsDragOverlay.test.js
frontend/src/components/storage/__tests__/StorageBrowser.dragmove.test.js
it.todo() stubs chosen over it.skip() — todo produces pending rather than skipped, giving clear Wave 1-4 promotion targets
Separate describe blocks per requirement ID — each UX-XX maps to an isolatable test group
duration_minutes completed_date tasks_completed tasks_total files_created files_modified
3 2026-06-15T18:13:21Z 2 2 8 0

Phase 10 Plan 05: Wave 0 xfail Test Stubs Summary

One-liner: 53 it.todo stubs across 8 files giving each of UX-02..09, UX-11, UX-13, UX-14 a promotion target before any Wave 1-4 implementation code is written.

What Was Built

Created 8 Vitest stub test files using the Nyquist pattern (RED stubs before implementation). Each file contains describe('UX-XX: ...') blocks with it.todo(...) entries that Wave 1-4 implementing plans will promote to real assertions.

Task 1: Skeleton + Dropdown Stubs (UX-02, UX-03, UX-04, UX-13, UX-14)

File Requirements Stub Count
StorageBrowser.skeleton.test.js UX-02, UX-13 7
AppSidebar.empty.test.js UX-03, UX-01 (micro), UX-14 10
AdminAuditView.skeleton.test.js UX-04, UX-01 (audit empty) 5
AdminUsersView.skeleton.test.js UX-04 3
dropdown.test.js UX-13 4

Task 1 commit: 7597035 — 5 files, 29 it.todo stubs

Task 2: Keyboard + OS-Drag + Drag-to-Move Stubs (UX-05..09, UX-11)

File Requirements Stub Count
keyboard.test.js UX-05, UX-06, UX-07, UX-08 11
OsDragOverlay.test.js UX-09 7
StorageBrowser.dragmove.test.js UX-11 6

Task 2 commit: 794ff42 — 3 files, 24 it.todo stubs

Total

  • 8 stub files created
  • 53 it.todo stubs total
  • 11 requirements covered: UX-02, UX-03, UX-04, UX-05, UX-06, UX-07, UX-08, UX-09, UX-11, UX-13, UX-14

Verification Results

  • All 8 files exist at the specified paths
  • Main repo test suite: 153/153 tests pass — no regressions
  • Stub files contain no assertions; it.todo() produces "pending" status in Vitest, not failures
  • Each requirement ID appears in at least one describe('UX-XX: ...') block
  • Grep coverage count: 14 lines match UX-0[23456789]|UX-1[1345]|UX-14 across all 8 files (minimum was 11)

Deviations from Plan

None — plan executed exactly as written.

Known Stubs

By design, all 53 test entries are it.todo() stubs. These are intentional Wave 0 placeholders — they exist specifically to be promoted to real it(...) assertions by the implementing waves (Waves 1-4, plans 10-06 through 10-11). They are not integration or correctness gaps.

Threat Flags

None — this plan creates only test stub files with no source code changes, no new network surface, and no security-relevant implementation.

Self-Check: PASSED

  • All 8 files confirmed present on disk
  • Commits 7597035 and 794ff42 confirmed in git log
  • No unexpected file deletions in either commit