curo1305andClaude Sonnet 4.6 475e519158 chore: archive v0.2 milestone files
Archive v0.2 (UI Overhaul and Optimization) to milestones/:
- milestones/v0.2-ROADMAP.md — full phase archive (Phases 8–11, 33 plans)
- milestones/v0.2-REQUIREMENTS.md — all 40 requirements marked complete
- milestones/v0.2-MILESTONE-AUDIT.md — audit artifact (passed, 40/40)
- MILESTONES.md — new living milestone index
- RETROSPECTIVE.md — new living retrospective with v0.2 section
- PROJECT.md — full evolution review: v0.2 requirements moved to Validated, 5 new Key Decisions added
- STATE.md — updated to milestone-complete status
- ROADMAP.md — v0.2 phases collapsed into <details> with progress table updated

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-17 14:26:19 +02:00

6.9 KiB
Raw Blame History

DocuVault — Project Retrospective

A living document updated after each milestone. Lessons feed forward into future planning.


Milestone: v0.2 — UI Overhaul and Optimization

Shipped: 2026-06-17 Phases: 4 (811) | Plans: 33 | Duration: 10 days (2026-06-07 → 2026-06-17) Git: 198 commits, 236 files changed, +39,557 / 6,288 lines

What Was Built

  • Backend monolith decomposition — three router monoliths (934L, 852L, 825L) split into focused sub-packages with zero URL or behavior changes; shared schemas extracted to api/schemas.py
  • Frontend client decomposition — client.js (635L) → 7 domain modules + barrel re-export; 35+ consumer files unchanged
  • Admin panel rearchitecture — standalone /admin/* route subtree; AdminLayout.vue; AdminSidebar.vue with 5 nav links; 5 deep-linkable views; to.matched.some() auth guard fix; GET /api/admin/overview aggregate endpoint
  • UX interaction layer — EmptyState.vue, skeleton loaders, keyboard shortcuts (/, U, N, Escape), OsDragOverlay.vue, Pinia toast store + ToastContainer.vue, BreadcrumbBar.vue, drag-to-move with Teleport dropdowns, AppIcon.vue (66 SVG instances centralized)
  • Responsive design + visual polish — hamburger sidebar drawer (below lg), adaptive document list columns, 36px touch targets, scrollable modals, @tailwindcss/forms baseline, consistent Tailwind-only spacing/typography/focus-visible/hover states
  • Bundle optimization — all admin routes lazy-loaded; dead code deleted; bundle 81 kB (30.6%) from baseline

What Worked

  • Wave parallelization — executing independent plans in parallel (e.g., CODE-01/02/03/04 in Phase 8 Wave 2) dramatically reduced wall-clock time; the wave structure in PLAN.md made this trivial to execute
  • Barrel re-export pattern — decomposing client.js with a barrel kept all 35+ consumer files unchanged; zero regressions, zero migration cost
  • Foundation-then-wire order — building EmptyState.vue, BreadcrumbBar.vue, AppIcon.vue, and the toast store as isolated components in Phase 10 Wave 0 before wiring them in Wave 1 kept each step reviewable and testable
  • Teleport for dropdowns — solving viewport-edge clipping with Teleport to="body" + getBoundingClientRect() was the right call; future virtual scrolling is now unblocked
  • UAT gap closure plans — having dedicated plans (10-13, 11-07) for UAT gaps rather than patching in-flight kept the execution clean and the gap closure auditable

What Was Inefficient

  • Phase 8 progress table not updated — the ROADMAP progress table showed "4/8 In Progress" for Phase 8 even after completion, discovered at milestone close. Progress table updates should be part of the plan execution checklist.
  • Admin auth guard bug caught late — the to.meta.requiresAdminto.matched.some() fix is a security-relevant change that wasn't caught until Phase 9. Nested route guards should be explicitly tested in Phase scaffolding.
  • 11-07 mobile toolbar gap — the mobile compact toolbar fix was a UAT gap rather than planned; the RESP-02 success criterion should have been clearer about the 550px threshold from the start.
  • Multiple SUMMARY.md formats — some phase summaries used **One-liner:** and some used ## One-liner; extracting them required heuristic grep patterns. A consistent frontmatter schema would help.

Patterns Established

  • Sub-router NO-prefix ruleAPIRouter() in sub-packages must carry no prefix; the parent include_router(sub, prefix=...) propagates. This is now in CLAUDE.md.
  • FastAPI 0.128+ empty-path restriction@router.get("") on a sub-router with empty include prefix raises FastAPIError; root routes must be registered on the parent aggregator directly.
  • to.matched.some() for Vue Router 4 meta inheritance — Vue Router 4 does not propagate meta to children automatically; direct to.meta checks are a security regression.
  • AdminLayout as route component, not App.vue branch — router resolves AdminLayout as the /admin component; its <router-view> renders children. App.vue needs no layout branching logic.
  • Lazy-load all non-critical routes — admin views and other non-initial-path routes should always be lazy-loaded by default; synchronous imports for non-critical routes are a bundle regression.

Key Lessons

  1. Verify test coverage includes nested route behavior. The to.matched.some() fix was a security-relevant change that required a specific negative test (non-admin navigating directly to /admin/users). Add nested-route auth tests to the scaffolding checklist for any phase that touches routing.
  2. Write success criteria with explicit thresholds. "Mobile responsive" in RESP-02 should have said "toolbar fits without horizontal scrolling at 375px and 550px" rather than leaving it implicit. Explicit viewport thresholds eliminate UAT guesswork.
  3. Archive progress table state in the phase summary. The ROADMAP progress table is read by the milestone close process; phases should update it as part of the "plan complete" ritual, not leave it for the orchestrator to discover at close.
  4. Barrel re-export is the zero-friction decomposition pattern. When splitting a large module, start with the barrel and establish the public API first. Consumer files never change; the decomposition is invisible to callers.

Cost Observations

  • Model: Claude Sonnet 4.6 throughout
  • No haiku or opus usage in v0.2
  • Notable: wave parallelization (35 independent plans per wave) was the primary efficiency lever; sequential execution of the same work would have taken ~23x longer

Process Evolution

Milestone Duration Phases Key Process Change
v0.1 ~16 days (2026-05-21→2026-06-06) 11 (17.4) Feature-first; security gates added mid-stream
v0.2 10 days (2026-06-07→2026-06-17) 4 (811) Quality-first; wave parallelization; milestone audit before close

Cumulative Quality

Milestone Tests at close Notes
v0.1 347 1 pre-existing failure (missing module)
v0.2 277 Reduction reflects dead test file deletion; coverage per line improved

Top Lessons (Verified Across Milestones)

  1. Security gates must run before phase advance, not as a post-close checklist. Both milestones had late-discovered security issues (v0.1: IDOR stubs, v0.2: auth guard). Bake the security agent into the plan execution ritual.
  2. Explicit success criteria with measurable thresholds eliminate UAT gaps. Vague criteria ("responsive") always produce UAT gap closure plans. Precise criteria ("at 375px and 550px viewport") do not.
  3. Milestone audits before archival are worth the overhead. The v0.2 audit caught stale artifacts and the esbuild CVE before the milestone was tagged. Running the audit as a prerequisite rather than a post-mortem saves remediation cost.