docs(phase-10): evolve PROJECT.md and resolve UAT after gap closure

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
curo1305
2026-06-16 20:12:46 +02:00
co-authored by Claude Sonnet 4.6
parent ac95c1243f
commit 83cdf28231
2 changed files with 6 additions and 3 deletions
+3 -1
View File
@@ -65,7 +65,7 @@ Every user's documents — and the credentials they use to store them — are in
## Context
- **Current state**: v0.2 in progress — Phase 9 complete (2026-06-13). Admin panel rearchitected as standalone /admin/* route subtree with AdminLayout, 5 dedicated views, corrected Vue Router 4 guard, admin login redirect, and new GET /api/admin/overview backend endpoint. Phase 10 (UX & Interaction) up next.
- **Current state**: v0.2 in progress — Phase 10 complete (2026-06-16). UX & Interaction layer ships: empty states, loading skeletons, keyboard shortcuts (/, U, N, Escape), OS drag-drop upload, toast notifications, BreadcrumbBar, AppIcon registry, drag-to-move, Teleport dropdowns. All 6 UAT gaps closed (plan 10-13): sidebar shimmer, search-at-root visibility, admin sidebar isolation, keyboard dispatch via matched.find(), Escape modifier, OS drop capture phase. 219 tests pass. Phase 11 (Visual Design, Responsive Layout & Cleanup) up next.
- **Tech stack**: FastAPI 0.136+ (Python 3.12), SQLAlchemy 2.0 async, Alembic, MinIO SDK; Vue 3 (Options API), Pinia, Vue Router 4, Vite, Tailwind CSS.
- **Code quality**: v0.1 was built feature-first under time pressure. Both backend and frontend contain duplication, inconsistent patterns, and components that grew beyond their original scope. v0.2 addresses this systematically.
- **Admin panel**: Now a standalone /admin/* route subtree with AdminLayout as the route component, AdminSidebar with 5 nav links, and 5 dedicated view components. Old AdminView.vue and tab components deleted. Admin users are redirected to /admin on login; non-admin users are blocked from /admin/* by a correct to.matched.some() guard.
@@ -107,6 +107,8 @@ Every user's documents — and the credentials they use to store them — are in
This document evolves at phase transitions and milestone boundaries.
Last updated: 2026-06-16
**After each phase transition** (via `/gsd-transition`):
1. Requirements invalidated? → Move to Out of Scope with reason
2. Requirements validated? → Move to Validated with phase reference
+3 -2
View File
@@ -1,9 +1,10 @@
---
status: diagnosed
status: resolved
phase: 10-ux-interaction
source: 10-01-SUMMARY.md, 10-02-SUMMARY.md, 10-03-SUMMARY.md, 10-04-SUMMARY.md, 10-06-SUMMARY.md, 10-07-SUMMARY.md, 10-08-SUMMARY.md, 10-09-SUMMARY.md, 10-10-SUMMARY.md, 10-11-SUMMARY.md, 10-12-SUMMARY.md
started: 2026-06-16T00:00:00Z
updated: 2026-06-16T15:30:00Z
updated: 2026-06-16T19:31:00Z
resolved_by: 10-13-PLAN.md
---
## Current Test