curo1305
1ae9930ca7
docs(14-04): complete analysis orchestration and API plan
2026-06-23 15:54:49 +02:00
curo1305
4e02b04ba8
docs(14-03): complete cache service and API plan
2026-06-23 15:36:24 +02:00
curo1305
493d348ba6
docs(14-01): complete Phase 14 Plan 01 red test contract
2026-06-23 15:00:57 +02:00
curo1305
b528b51881
docs(phase-14): plan selective analysis and byte cache
2026-06-23 14:24:43 +02:00
curo1305
cd5bd82260
docs(13-11): update ROADMAP.md via gsd roadmap.update-plan-progress — Phase 13 11/11 summaries verified
2026-06-23 00:19:40 +02:00
curo1305
e68faf3051
chore(13-11): bump to v0.3.0, update docs, roadmap, and Phase 13 security gate evidence
...
- Version bump: 0.2.6 → 0.3.0 (Phase 13 complete — full cloud mutation surface shipped)
- CLAUDE.md: update current-state, shared module map, and Phase 13 non-negotiable rules
- README.md: add cloud file management, connection health, and authorized preview features; add Phase 13 mutation API table; mark Phase 13 complete
- ROADMAP.md: mark Phase 13 11/11 plans complete
- SECURITY.md: add Phase 13 threat register (T-13-01 through T-13-34), gate evidence (766 backend + 429 frontend tests pass, bandit 0 HIGH, npm audit 0 high/critical, gitleaks 3 pre-existing)
2026-06-23 00:14:57 +02:00
curo1305
e809df9f51
docs(13-10): complete frontend health UX and rendered-flow plan summary
2026-06-22 23:59:08 +02:00
curo1305
a77b7324aa
docs(13-09): complete move and delete mutation plan summary
2026-06-22 20:04:38 +02:00
curo1305
3e9355f42d
docs(13-08): complete create-folder and rename collision, stale guard, reconciliation plan summary
2026-06-22 19:53:24 +02:00
curo1305
561a40908d
docs(13-07): complete cloud queue and preview plan summary
2026-06-22 19:45:55 +02:00
curo1305
fc28e032be
docs(13-06): complete upload follow-through plan
2026-06-22 19:31:38 +02:00
curo1305
cad5ef5de2
docs(13-05): complete upload mechanics plan
2026-06-22 19:22:40 +02:00
curo1305
7501036300
docs(13-03): complete cloud operations seam plan
2026-06-22 18:45:54 +02:00
curo1305
f2411de85e
docs(13-02): complete red frontend test plan for cloud queue, health, and preview
2026-06-22 18:16:47 +02:00
curo1305
451d30208c
docs(13-01): complete red contract suite plan
2026-06-22 18:03:09 +02:00
curo1305
aa1d626187
docs(12.1-04): complete plan 04 summary and state updates
2026-06-22 09:48:33 +02:00
curo1305
9ef7f81b3f
docs(12.1-03): complete plan 03 summary and state updates
2026-06-22 08:55:02 +02:00
curo1305
792a25fad7
docs(12.1-02): complete plan 02 summary and state updates
2026-06-22 08:38:18 +02:00
curo1305
a6e8a597e7
docs(12.1-01): complete Plan 01 summary and state updates
2026-06-22 08:20:06 +02:00
curo1305 and Claude Sonnet 4.6
c283623903
docs(phase-12): resolve UAT gaps and close phase after 12-06 gap closure
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-21 22:38:23 +02:00
curo1305
34be364ca7
docs(phase-12): update tracking after gap closure wave
2026-06-20 10:50:38 +02:00
curo1305
8e5d7a1900
docs(phase-12): complete phase execution
2026-06-19 06:05:03 +02:00
curo1305
b7ae44b3f8
docs(phase-12): update tracking after wave 4
2026-06-19 01:55:47 +02:00
curo1305
8a99230048
docs(phase-12): update tracking after wave 3
2026-06-18 23:33:03 +02:00
curo1305
6f0ecfa39b
docs(phase-12): update tracking after wave 2
2026-06-18 23:19:55 +02:00
curo1305
71ba0293a5
docs(phase-12): update tracking after wave 1
2026-06-18 22:39:35 +02:00
curo1305
a323276e37
docs: create milestone v0.3 roadmap (5 phases)
2026-06-17 23:27:21 +02:00
curo1305 and Claude Sonnet 4.6
475e519158
chore: archive v0.2 milestone files
...
Archive v0.2 (UI Overhaul and Optimization) to milestones/:
- milestones/v0.2-ROADMAP.md — full phase archive (Phases 8–11, 33 plans)
- milestones/v0.2-REQUIREMENTS.md — all 40 requirements marked complete
- milestones/v0.2-MILESTONE-AUDIT.md — audit artifact (passed, 40/40)
- MILESTONES.md — new living milestone index
- RETROSPECTIVE.md — new living retrospective with v0.2 section
- PROJECT.md — full evolution review: v0.2 requirements moved to Validated, 5 new Key Decisions added
- STATE.md — updated to milestone-complete status
- ROADMAP.md — v0.2 phases collapsed into <details> with progress table updated
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-17 14:26:19 +02:00
curo1305
595b33a68c
fix(phase-11): close mobile storage UAT gaps
2026-06-17 10:48:35 +02:00
curo1305
f667a3bbc8
docs(phase-11): update tracking after wave 5 — all plans complete
2026-06-17 08:03:50 +02:00
curo1305
e72506fc89
docs(phase-11): update tracking after wave 4
2026-06-16 21:51:23 +02:00
curo1305
deea237033
docs(phase-11): update tracking after wave 3
2026-06-16 21:38:15 +02:00
curo1305
71ddbfd426
docs(phase-11): update tracking after wave 2
2026-06-16 21:26:47 +02:00
curo1305
6155aaba46
docs(phase-11): update tracking after wave 1
2026-06-16 21:12:35 +02:00
curo1305
7547e8ae97
docs(phase-11): update tracking after wave 0
2026-06-16 21:07:57 +02:00
curo1305 and Claude Sonnet 4.6
ac95c1243f
docs(phase-10): complete gap closure verification — 219 tests, all 6 UAT gaps closed
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-16 20:11:51 +02:00
curo1305
b46b97864e
docs(phase-10): update tracking after wave 5 complete (12/12 plans)
2026-06-16 09:40:33 +02:00
curo1305
01a0605831
docs(phase-10): update tracking after wave 4 complete (11/12 plans)
2026-06-16 08:29:09 +02:00
curo1305
dbb07c8c7d
docs(phase-10): update tracking after wave 3 complete (10/12 plans)
2026-06-15 20:48:13 +02:00
curo1305
1cb63d690d
docs(phase-10): update tracking after wave 2 complete (9/12 plans)
2026-06-15 20:38:48 +02:00
curo1305
9a435f8fc0
docs(phase-10): update tracking after wave 1 complete (8/12 plans)
2026-06-15 20:30:58 +02:00
curo1305
a1885122a1
docs(phase-10): update tracking after wave 0 complete (5/12 plans)
2026-06-15 20:18:49 +02:00
curo1305 and Claude Sonnet 4.6
d3d3f711eb
docs(10): create phase plan — 12 plans, 6 waves, UX-01..14 + CODE-05
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-15 06:55:11 +02:00
curo1305 and Claude Sonnet 4.6
e6f5f2be3b
test(phase-09): complete UAT — 9/9 tests passed; mark phase complete
...
All 9 UAT items verified via live API + source inspection:
- GET /api/admin/overview live data (78 users, 8MB storage, 10 audit rows)
- Auth guard: 401 unauthenticated, 403 non-admin on all protected endpoints
- Admin login redirect (D-08) confirmed in LoginView.vue line 212
- Sidebar: 5 nav links, indigo Admin badge, no back-to-app link
- 4-stat-card overview + When/Event/Actor/Target/IP audit table
- 5 standalone admin views (Users, Quotas, AI, Audit) with no Pinia stores
- API key write-only invariant confirmed in AdminAiView.vue
- Color-coded audit badges (auth=blue, admin=amber, folder/share=purple)
- to.matched.some() guard covers all /admin/* child routes
- No sensitive fields (password_hash, credentials_enc) in any response
Phase 9 marked complete. STATE.md and PROJECT.md updated for Phase 10.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-13 11:32:19 +02:00
curo1305 and Claude Sonnet 4.6
baa462870d
docs(phase-09): update tracking after wave 4 — plan 09-05 complete
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-12 22:09:22 +02:00
curo1305 and Claude Sonnet 4.6
9ddd599897
docs(phase-09): update tracking after wave 3 — plan 09-04 complete
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-12 16:14:43 +02:00
curo1305 and Claude Sonnet 4.6
b19ab8bcd1
docs(phase-09): update tracking after wave 2 — plan 09-03 complete
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-12 16:03:58 +02:00
curo1305 and Claude Sonnet 4.6
1b1cc5d566
docs(phase-09): update tracking after wave 1 — plans 09-01 + 09-02 complete
...
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-12 15:54:05 +02:00
curo1305 and Claude Sonnet 4.6
ba30ada87a
docs(09): create phase 9 plan — Admin Panel Rearchitecture
...
5 plans across 4 waves covering ADMIN-08..12, CODE-06, CODE-09:
- 09-01 (W1): backend GET /api/admin/overview + 8 ADMIN-11 tests
- 09-02 (W1): AdminLayout + AdminSidebar + AdminOverviewView + getAdminOverview API
- 09-03 (W2): extract 4 admin tab components to standalone views
- 09-04 (W3): nested /admin route + to.matched.some guard + D-08/D-09/D-10 redirects + Tailwind safelist (sky+amber) + login redirect + delete AdminView/tabs
- 09-05 (W4): CODE-09 comment purge for Phase 9 + retroactive Phase 8 backend sub-packages + human UAT checkpoint
All locked decisions D-01..D-16 mapped to tasks; safelist corrected to include sky (OneDrive) and amber (audit badges) per RESEARCH.md Pattern 7.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-12 15:34:31 +02:00
curo1305 and Claude Sonnet 4.6
a42f0ed623
test(08): UAT complete — 7/7 passed, phase 8 marked complete
...
All 7 UAT tests passed (cold start, auth, documents, admin, cloud storage,
session revocation, Vite 6 build). Security gate: 0 threats open. Phase 8
transition complete — ROADMAP.md updated, PROJECT.md evolved with Phase 8
decisions, stale handoff deleted. Next: Phase 9 (Admin Panel Rearchitecture).
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com >
2026-06-12 11:28:56 +02:00