curo1305andClaude Sonnet 4.6 4f6ee06f51 docs(10): mark Phase 10 complete — 15/15 truths verified, 211 tests pass
All 12 plans executed. Gap-closure committed in 6b56763 (Escape modal close,
revoke/rename toasts, StorageBrowser picker tests). Code review critical findings
resolved (CR-01 prop mutation, CR-02 double-shortcut on modal). VERIFICATION.md
shows 15/15 verified. Known pre-existing: esbuild CVE-GHSA-gv7w requires Vite 8
upgrade (breaking) — filed for Phase 11 chore.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-06-16 10:19:59 +02:00

91 lines
3.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
---
gsd_state_version: 1.0
milestone: v0.2
milestone_name: Phases
current_phase: 10
status: completed
last_updated: "2026-06-16T08:18:26.700Z"
last_activity: 2026-06-16 -- Phase 10 marked complete
progress:
total_phases: 17
completed_phases: 16
total_plans: 90
completed_plans: 90
percent: 94
---
# Project State
**Project:** DocuVault
**Status:** Phase 10 complete
**Current Phase:** 10
**Last Updated:** 2026-06-13
## Current Position
Phase: 10 — COMPLETE
Plan: 1 of 12
Status: Phase 10 complete
Last activity: 2026-06-16 -- Phase 10 marked complete
## Phase Status
| Phase | Requirements | Status |
|-------|-------------|--------|
| 8. Stack Upgrade & Backend Decomposition | PERF-01, CODE-01, CODE-02, CODE-03, CODE-04, CODE-08 | **Complete (8/8 plans)** |
| 9. Admin Panel Rearchitecture | ADMIN-08..12, CODE-06, CODE-09 | **Complete (5/5 plans)** |
| 10. UX & Interaction | UX-01..14, CODE-05 | Not started |
| 11. Visual Design, Responsive Layout & Cleanup | VISUAL-01..04, RESP-01..05, CODE-07, PERF-02, PERF-03 | Not started |
## Performance Metrics
| Metric | Value |
|---|---|
| Phases complete | 2 / 4 |
| Requirements mapped | 40 / 40 |
| Plans written | 83 |
| Plans complete | 83 |
## Accumulated Context
### Key Decisions
*(Carries forward from v0.1 — see PROJECT.md for full decision log.)*
| Decision | Rationale |
|---|---|
| Options API preserved in v0.2 refactor | Composition API migration is scope-creep; refactor within Options API |
| Admin panel as standalone route subtree | AdminView as tabs-on-user-layout is architecturally wrong; v0.2 fixes this |
| No rewrites — refactor only | Preserve existing tests and behavior; change internal structure, not contracts |
| client.js barrel re-export pattern | Zero consumer churn; all 35+ import sites stay unchanged; mocks still work |
| Sub-routers carry NO prefix | Parent APIRouter prefix propagates — sub-routers with prefix cause double-segment URLs |
| AdminLayout as route component, not App.vue branch | Router resolves AdminLayout as the /admin component; its router-view renders children |
| to.matched.some() for requiresAdmin guard | Vue Router 4 does not inherit meta to children; direct to.meta check is a security regression |
| FastAPI 0.128+ empty-path sub-router restriction | `@router.get("")` on sub-router with empty include prefix fails; register root routes on parent aggregator |
| Vite 6 upgrade resolves 2 CVEs | CVE-2026-39363/39364 closed; npm audit now clean |
### Roadmap Evolution
- v0.1 completed: all 7 foundation phases + security hardening (2026-06-06)
- v0.2 started: UI overhaul, code quality, admin panel rearchitecture (2026-06-07)
- v0.2 roadmap defined: 4 phases, 40 requirements, phases 811 (2026-06-07)
### Open Questions
None.
### Blockers
None.
## Session Continuity
_Updated at each phase transition._
| Field | Value |
|---|---|
| Last session | 2026-06-13 — Phase 9 complete; UAT 9/9 passed |
| Next action | /gsd:discuss-phase 10 then /gsd:plan-phase 10 |
| Pending decisions | None |
| Resume file | None |